FUTURE

 

The journey must go on. The KSRTC has appellation for the caravan of peace and the movement of comfort. The all round winner of traveling for travelers. The show goes on, the fire beams on KSRTC. The fiasco of a journey and the frayed tempers of voyagers trade in to make the diamond core of the institution. The hurry burry life of a mechanical person often needs to be hit on the hue. KSRTC's insistence on pursuing a single-point effort has indeed proven the gamut of its customers.

 

 

An Eternal Journey calling out to the voice of the people

Our Winning Team
Our winning team of 22459 is fully committed to providing all our customers with a quality service at value for money prices. Our skilled professional drivers drive millions of miles every year, over all types of roads and in all kinds of weather conditions. They are our frontline staff without whose skill and commitment we could not succeed.


At present KSRTC has a workforce of 22459 permanent employees as given below and 179 officers at various levels . In addition to this 10997 empanel and employment exchange hands are also being utilized according to the necessity for operation of services.

 

 

KERALA STATE ROAD TRANSPORT CORPORATION

Bus Terminal & Shopping Complex at Calicut

Project Profile

Location

             The proposed location of the project is the site along Mavoor Road at which the present Bus Station is situated.

The Project

                  The proposed project is envisaged to accommodate all the required facilities of the present Bus station in addition to the future needs and other infrastructural facilities required for the smooth functioning of the Bus station. The Bus station is design as a model project with all facilities and 800 finishes to the math the recent developments in international projects. Since the project is located in the highly commercial area of Calicut. The project in envisaged to utilised the commercial important to make the projects financially feasible. The space buildable below and above the Bus terminals were fully utilized for providing commercial spaces, Parking facilities etc within the permissible limits of the Kerala Building rules.

Cost of Project

                     The approximate cost of the project comes to Rs. 27 cores including all finishing works.

Time of Completion

                            The time of completion of the project in the 12 months from handing over the sight for execution. However the contract will be framed in such a way that the required space will be partially handed over so as to open the bus terminal before the end of the year since the Bus station is located at the lower part.

Mode of Execution

                           The commissioning of the project will be on B.O.T basis with full investment at reasonable terms. The agencies has to be properly pre-qualified to ensure the creditability and capacity for handling the project.

 

Methodology of selection of Agency for B.O.T. System

 

First Stage Pre-Qualification

             Previous experience in similar projects, financial capacity of the agency, other details of establishments and the credibility of the establishment will be considered for Pre-qualifying at this stage. Marks will be awarded for various aspects for selection of agency. Three or four agencies will be selected and graded according to the valuation and tabulation of marks for the final bid. The main condition of pre-qualifying are minimum turn over of Rs. 25 cores, previous experience of similar projects costing more than Rs. 5 cores and net worth about Rs.10 cores etc. The lease of period will be taken as 26 ½ years and the figure quoted will be annual lease amount.

Final Bid and Selection

              After issuing the Bid documents a pre-bid meeting will be arranged for clarification 

Of all aspects of the bid. The conditions will be negotiated with the highest Bidder. Agreement form will be provided with the bid documents keeping all legal and penal clauses to ensure timely completion of the project.

Project Monitoring

                 The project monitoring will be carried out jointly by the engineering wing of K.S.R.T.C and the Architects to ensure quality, stability and timely completion as per the approved projects. The monitoring cell will be meeting at regular intervals to appraise K.S.R.T.C regarding the progress.

PROJECT DETIALS             

Floor

Facilities provided

Area

Ground Floor

Space for 40 nos of bus parking

Space for idle parking, Waiting Space, Lobby area

Reservation/Office Counter, Stalls, Lockers

Pay and Use toilets for ladies and gents

Washing Ramps, Fuel Pump, Workshop

5548.3 m2

I st Basement Floor

166 Nos of Shops

5540.69 m2

 

II nd Basement floor

Parking space for 145 cars

Parking space for two wheelers

Loading & Unloading space

5352.78 m2

I st floor

Office space, Canteen, Toilets for Ladies & Gents

1503.9 m2

Upper Ground floor

Hotel Block, Spacious Lobby/Lounge, Restaurant

Shops, Toilets, Kitchen, Office Block, Dining hall

Banquet Hall between two towers

 

2270.4 m2

Typical Floors (Eight floors)

Hotel Block-798.01* 8=6384.1m2

18*7=126 rooms

Top Floor Common Amenity, Health Club etc

Office Block-798.01*8=6384.1 m2

 

 

Updated on 24.05.2006